1,600 tons fabricated and erected in just seven months Introduction: In Egypt, RAMEC is executing a demanding steel construction project: the BRT Multi-Use Building located at a major highway interchange. The multi-storey building combines several functions in one structure, including office areas, a shopping center, and a parking deck on the upper level. Due to its position at a highly visible traffic junction, the project is designed as a modern and flexible building that combines functionality, accessibility, and efficient construction. The steel structure forms the main load-bearing framework for the different floors and usage areas. RAMEC’s scope includes the fabrication and erection of approximately 1,600 tons of structural steel, as well as trapezoidal steel decking and concrete works. With precise fabrication, well-organized erection planning, and efficient site coordination, the project was executed within a very short timeframe. One of the key highlights of this project is the speed of execution: the steel structure was fabricated and erected within only seven months. For a multi-storey building of this scale, with different functional areas and demanding requirements for structure, logistics, and installation, this represents a strong achievement. Facts (Project 32):
Tonnage Location Project Type Date
1,600 tons Egypt (Highway Interchange) Egypt (Highway Interchange) July 2026