Engineered for 1,000 kg/m² loads with 2.5-meter built-up girders
Introduction:
In New Cairo, Egypt, RAMEC is executing a technically demanding steel construction project for a large Wedding Hall and Event Hall within a hotel development. The structure includes approximately 723 tons of structural steel and is part of a larger project area where RAMEC has already delivered several steel construction packages.
The Wedding Hall places special demands on structural design, erection planning, and detailing. The building is designed for high occupancy, large open areas, and intensive event use. For this reason, the steel structure has been engineered for an exceptional load requirement of up to 1 ton per square meter (1,000 kg/m²).
One of the key features of the project is the use of massive built-up sections. The main girders reach heights of up to 2.5 meters and are fabricated with steel flanges of up to 50 millimeters thickness. These heavy, project-specific components provide large spans, high load-bearing capacity, and a stable multi-level structural system.
The erection of these large steel components requires precise planning and heavy lifting equipment, closely coordinating fabrication, transport, crane positioning, and erection sequence to deliver large column-free areas and long-term operational safety.
Facts (Project 35):
| Tonnage | Location | Project Type | Date |
| approx. 723 tons | New Cairo, Egypt | Hall Construction | December 2025 |