{"id":82,"date":"2025-01-01T09:08:32","date_gmt":"2025-01-01T09:08:32","guid":{"rendered":"http:\/\/xtratheme.com\/default\/?p=82"},"modified":"2025-03-13T10:54:09","modified_gmt":"2025-03-13T10:54:09","slug":"project-7-january-2025","status":"publish","type":"post","link":"https:\/\/www.ramec-eg.com\/de\/project-7-january-2025\/","title":{"rendered":"Pilotinstallation des neuen Stachetsystems"},"content":{"rendered":"<h3>Pilotinstallation des neuen Stachetsystems<\/h3>\n<p><strong>Introduction:<\/strong> On the Swabian Alb, we conducted a pilot installation of our new stachetsystem, which features a sleek design and high levels of prefabrication. Intended for residential projects, this system was set up in a very short timeframe.<\/p>\n<p><strong>Challenges:<\/strong> As this was a newly developed system, all components had to be perfectly coordinated and installed within just two days. Additionally, the double-rod post design was required to ensure a modern look without sacrificing durability.<\/p>\n<p><strong>Solution:<\/strong> We industrially prefabricated all modules and delivered them as a modular system to the site. Thanks to precise plug-and-bolt connections, 90 linear meters of fencing were installed on schedule, demonstrating the system\u2019s efficiency.<\/p>\n<p><strong>Result:<\/strong> The client gained a stylish, long-lasting enclosure that blends seamlessly with the residential environment. For us, this project serves as a successful reference, already leading to the next order of 150 balconies using the same system.<\/p>\n<p><strong>Facts (Project 7):<\/strong><\/p>\n<table width=\"330\">\n<tbody>\n<tr>\n<td width=\"62\"><strong>Tonnage<\/strong><\/td>\n<td width=\"87\"><strong>Ort<\/strong><\/td>\n<td width=\"91\"><strong>Projekt Typ<\/strong><\/td>\n<td width=\"90\"><strong>Zeitraum<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"62\">6 tons<\/td>\n<td width=\"87\">Swabian Alb<\/td>\n<td width=\"91\">Wohngeb\u00e4ude<\/td>\n<td width=\"90\">January 2025<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"excerpt":{"rendered":"<p>Pilot Installation of the New Stacheteystem Introduction: On the Swabian Alb, we conducted a pilot installation of our new stachetsystem, &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.ramec-eg.com\/de\/project-7-january-2025\/\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":2540,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[5],"tags":[8,13,26],"class_list":["post-82","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-news","tag-business","tag-how-to","tag-stock","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/82","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/comments?post=82"}],"version-history":[{"count":9,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/82\/revisions"}],"predecessor-version":[{"id":2259,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/82\/revisions\/2259"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media\/2540"}],"wp:attachment":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media?parent=82"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/categories?post=82"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/tags?post=82"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}