{"id":3436,"date":"2026-11-17T13:12:30","date_gmt":"2026-11-17T13:12:30","guid":{"rendered":"https:\/\/www.ramec-eg.com\/?p=3436"},"modified":"2026-11-17T13:34:07","modified_gmt":"2026-11-17T13:34:07","slug":"5project-38-july-2026","status":"publish","type":"post","link":"https:\/\/www.ramec-eg.com\/de\/5project-38-july-2026\/","title":{"rendered":"Shopping Mall New Cairo \u2013 1,400 Tons of Structural Steel for a Modern Commercial Project in Egypt"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"3436\" class=\"elementor elementor-3436\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3ac418f4 e-flex e-con-boxed e-con e-parent\" data-id=\"3ac418f4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-498a8223 elementor-widget elementor-widget-text-editor\" data-id=\"498a8223\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Multi-storey commercial steel frame with composite decking and concrete<\/strong><\/p><p><strong>Introduction:<\/strong><\/p><p>In New Cairo, Egypt, RAMEC is executing a demanding steel construction project in the commercial and retail sector: a new shopping mall with approximately 1,400 tons of structural steel. The multi-storey steel structure is designed for modern retail areas, circulation zones, and flexible commercial use.<\/p><p>The steel structure forms the main load-bearing system of the building and enables large open spaces essential for modern commercial properties. In addition to the main steel structure, the project includes trapezoidal steel decking with concrete, creating an efficient composite floor system.<\/p><p>RAMEC&#8217;s scope includes the fabrication, delivery, and erection of the steel structure, as well as the installation of the composite floors. Precise prefabrication and a clearly planned erection sequence ensure efficient execution on site.<\/p><p>For multi-storey commercial buildings, accuracy, coordination, and speed are essential so the structure seamlessly supports fit-out works, fa\u00e7ade systems, MEP installations, and long-term mall operations.<\/p><p><strong>Facts (Project 38):<\/strong><\/p><table style=\"height: 96px;\" width=\"503\"><tbody><tr><td width=\"30%\"><strong>Tonnage<\/strong><\/td><td width=\"33%\"><strong>Standort<\/strong><\/td><td width=\"25%\"><strong>Projekttyp<\/strong><\/td><td width=\"20%\"><strong>Datum<\/strong><\/td><\/tr><tr><td width=\"273\">1,400 tons<\/td><td width=\"64\">New Cairo, Egypt<\/td><td style=\"direction: ltr;\" width=\"211\">Shopping Mall<\/td><td width=\"82\">July 2025<\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Multi-storey commercial steel frame with composite decking and concrete Introduction: In New Cairo, Egypt, RAMEC is executing a demanding steel &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.ramec-eg.com\/de\/5project-38-july-2026\/\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":3437,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-3436","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/comments?post=3436"}],"version-history":[{"count":5,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3436\/revisions"}],"predecessor-version":[{"id":3455,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3436\/revisions\/3455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media\/3437"}],"wp:attachment":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media?parent=3436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/categories?post=3436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/tags?post=3436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}