{"id":3413,"date":"2026-11-17T13:02:18","date_gmt":"2026-11-17T13:02:18","guid":{"rendered":"https:\/\/www.ramec-eg.com\/?p=3413"},"modified":"2026-11-17T13:07:34","modified_gmt":"2026-11-17T13:07:34","slug":"project-37-october-2026","status":"publish","type":"post","link":"https:\/\/www.ramec-eg.com\/de\/project-37-october-2026\/","title":{"rendered":"Hotel Extension in Hurghada \u2013 1,300 Tons of Structural Steel on an Existing Concrete Building"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"3413\" class=\"elementor elementor-3413\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3ac418f4 e-flex e-con-boxed e-con e-parent\" data-id=\"3ac418f4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-498a8223 elementor-widget elementor-widget-text-editor\" data-id=\"498a8223\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Four new steel floors, roof terrace, and skylight over an existing hotel<\/strong><\/p><p><strong>Introduction:<\/strong><\/p><p>In Hurghada, Egypt, RAMEC is executing a highly demanding steel construction project in the hotel sector. A new steel structure of approximately 1,300 tons is being installed on top of an existing concrete hotel building, adding four additional floors, cantilevered areas, a roof terrace, and a skylight and glass roof construction.<\/p><p>The new steel structure must be precisely connected to the existing concrete structure while meeting demanding load requirements of up to 750 kg\/m\u00b2 for the additional floors, terrace areas, and public hotel zones.<\/p><p>One of the main challenges is the erection process: existing underground parking areas, limited working space, and a small number of available crane positions require extremely precise erection planning and close coordination between fabrication, logistics, and the site team.<\/p><p>In addition to the main steel structure, the project includes the installation of trapezoidal steel decking with concrete to create a robust composite floor system, crowned by an architectural skylight and glass roof that brings natural light into the building.<\/p><p><strong>Facts (Project 37):<\/strong><\/p><table style=\"height: 96px;\" width=\"503\"><tbody><tr><td width=\"30%\"><strong>Tonnage<\/strong><\/td><td width=\"33%\"><strong>Standort<\/strong><\/td><td width=\"25%\"><strong>Projekttyp<\/strong><\/td><td width=\"20%\"><strong>Datum<\/strong><\/td><\/tr><tr><td width=\"273\">1,300 tons<\/td><td width=\"64\">Hurghada, Egypt<\/td><td style=\"direction: ltr;\" width=\"211\">Extension of Hotel Building<\/td><td width=\"82\">October 2025<\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Four new steel floors, roof terrace, and skylight over an existing hotel Introduction: In Hurghada, Egypt, RAMEC is executing a &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.ramec-eg.com\/de\/project-37-october-2026\/\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":3421,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-3413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/comments?post=3413"}],"version-history":[{"count":5,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3413\/revisions"}],"predecessor-version":[{"id":3435,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/3413\/revisions\/3435"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media\/3421"}],"wp:attachment":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media?parent=3413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/categories?post=3413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/tags?post=3413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}