{"id":2317,"date":"2025-03-05T10:04:38","date_gmt":"2025-03-05T10:04:38","guid":{"rendered":"https:\/\/remark3demos3.com\/ramec\/?p=2317"},"modified":"2025-03-13T11:54:13","modified_gmt":"2025-03-13T11:54:13","slug":"project-2-october-2023","status":"publish","type":"post","link":"https:\/\/www.ramec-eg.com\/de\/project-2-october-2023\/","title":{"rendered":"Schneller Hallenbau f\u00fcr die Tischlerei in Hohenlohe"},"content":{"rendered":"<h3>Schneller Hallenbau f\u00fcr die Tischlerei in Hohenlohe<\/h3>\n<p><strong>Introduction:<\/strong> In the Hohenlohe region, we constructed a new production hall for a family-run carpentry business urgently needing replacement facilities after a fire. Covering about 1,500 sqm, the hall was built swiftly using a modern steel framework and durable wall elements.<\/p>\n<p><strong>Challenges:<\/strong> The carpentry had to resume operations as quickly as possible, so we were given a tight deadline. Moreover, we faced challenging weather conditions during assembly, requiring robust construction methods to stay on schedule.<\/p>\n<p><strong>Solution:<\/strong> With experienced crews and prefabricated hall components, we began erection right after the building permit was issued. The contract was signed on August 1, and by December 1 the machines were already operating in the new hall.<\/p>\n<p><strong>Result:<\/strong> The carpentry benefited from a rapid return to full production and a modern hall designed for future expansion. Through our efficient hall construction approach, the company gained a long-lasting and functional workspace.<\/p>\n<p><strong>Facts (Project 2):<\/strong><\/p>\n<table width=\"346\">\n<tbody>\n<tr>\n<td width=\"62\"><strong>Tonnage<\/strong><\/td>\n<td width=\"74\"><strong>Ort<\/strong><\/td>\n<td width=\"118\"><strong>Projekt Typ<\/strong><\/td>\n<td width=\"92\"><strong>Zeitraum<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"62\">88 tons<\/td>\n<td width=\"74\">Hohenlohe<\/td>\n<td width=\"118\">Hall Construction<\/td>\n<td width=\"92\">October 2023<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"excerpt":{"rendered":"<p>Rapid Hall Construction for Carpentry in Hohenlohe Introduction: In the Hohenlohe region, we constructed a new production hall for a &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.ramec-eg.com\/de\/project-2-october-2023\/\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":2388,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2317","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-news","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/comments?post=2317"}],"version-history":[{"count":4,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2317\/revisions"}],"predecessor-version":[{"id":2699,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2317\/revisions\/2699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media\/2388"}],"wp:attachment":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media?parent=2317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/categories?post=2317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/tags?post=2317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}