{"id":2309,"date":"2025-03-05T10:04:31","date_gmt":"2025-03-05T10:04:31","guid":{"rendered":"https:\/\/remark3demos3.com\/ramec\/?p=2309"},"modified":"2025-03-13T11:49:34","modified_gmt":"2025-03-13T11:49:34","slug":"project-17-january-2024","status":"publish","type":"post","link":"https:\/\/www.ramec-eg.com\/de\/project-17-january-2024\/","title":{"rendered":"F\u00fcnf massive T\u00fcrme f\u00fcr Maschinen in Afrika"},"content":{"rendered":"<h3>F\u00fcnf massive T\u00fcrme f\u00fcr Maschinen in Afrika<\/h3>\n<p><strong>Introduction:<\/strong> In Africa, we built five massive towers for a German machinery manufacturer, serving as bases for various machine units. These towers had to meet stringent structural requirements while remaining adaptable for different machine configurations.<\/p>\n<p><strong>Challenges:<\/strong> The installation took place in tight halls, requiring complex logistics and specialized lifting methods. Moreover, impeccable dimensional accuracy was necessary so that machines could be mounted precisely later on.<\/p>\n<p><strong>Solution:<\/strong> We produced the steel framework in the form of modular tower segments, which were then assembled on site with millimeter precision. Thorough pre-planning and close coordination with the machinery manufacturer enabled a delay-free completion.<\/p>\n<p><strong>Result:<\/strong> The five towers stand firmly and provide sufficient load capacity for the subsequent machine installations. The client benefited from a smooth industrial construction process and a highly accurate steel construction solution.<\/p>\n<p><strong>Facts (Project 17):<\/strong><\/p>\n<table width=\"398\">\n<tbody>\n<tr>\n<td width=\"92\"><strong>Tonnage<\/strong><\/td>\n<td width=\"64\"><strong>Ort<\/strong><\/td>\n<td width=\"152\"><strong>Projekt Typ<\/strong><\/td>\n<td width=\"90\"><strong>Zeitraum<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"92\">300 tons steel<\/td>\n<td width=\"64\">Africa<\/td>\n<td width=\"152\">Industrial Construction<\/td>\n<td width=\"90\">January 2024<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"excerpt":{"rendered":"<p>Five Massive Towers for Machinery in Africa Introduction: In Africa, we built five massive towers for a German machinery manufacturer, &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.ramec-eg.com\/de\/project-17-january-2024\/\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":2403,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2309","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-news","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/comments?post=2309"}],"version-history":[{"count":6,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2309\/revisions"}],"predecessor-version":[{"id":2668,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/posts\/2309\/revisions\/2668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media\/2403"}],"wp:attachment":[{"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/media?parent=2309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/categories?post=2309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ramec-eg.com\/de\/wp-json\/wp\/v2\/tags?post=2309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}