Four new steel floors, roof terrace, and skylight over an existing hotel
Introduction:
In Hurghada, Egypt, RAMEC is executing a highly demanding steel construction project in the hotel sector. A new steel structure of approximately 1,300 tons is being installed on top of an existing concrete hotel building, adding four additional floors, cantilevered areas, a roof terrace, and a skylight and glass roof construction.
The new steel structure must be precisely connected to the existing concrete structure while meeting demanding load requirements of up to 750 kg/m² for the additional floors, terrace areas, and public hotel zones.
One of the main challenges is the erection process: existing underground parking areas, limited working space, and a small number of available crane positions require extremely precise erection planning and close coordination between fabrication, logistics, and the site team.
In addition to the main steel structure, the project includes the installation of trapezoidal steel decking with concrete to create a robust composite floor system, crowned by an architectural skylight and glass roof that brings natural light into the building.
Facts (Project 37):
| Tonnage | Standort | Projekttyp | Datum |
| 1,300 tons | Hurghada, Egypt | Extension of Hotel Building | October 2025 |