60-meter truss girders combining long spans with architectural marble cladding
Introduction:
For a major project in New Cairo, Egypt, RAMEC is delivering the steel structure for an Olympic swimming pool and a large spa and leisure complex. The project includes approximately 174 tons of structural steel and is defined by its striking, large-span truss girders.
A key feature of this project is the use of massive truss girders with spans of up to 60 meters. These large structural elements form the basis for wide roof projections, canopy areas, and architecturally distinctive façade components, combining high load-bearing performance with an elegant steel design language.
One of the most demanding aspects of the project is the intended architectural finish: parts of the steel structure will later be clad with aluminum honeycomb panels faced with real Egyptian marble, giving the complex a prestigious appearance.
In addition to the long-span trusses, the project includes roof overhangs, façade structures, and bracing steel elements designed to reliably meet both technical and architectural requirements for a high-quality leisure and sports development in New Cairo.
Facts (Project 36):
| Tonnage | Standort | Projekttyp | Datum |
| approx. 174 tons | New Cairo, Egypt | Hall Construction | October 2025 |